• Zum Seiteninhalt (Accesskey 1)
  • Zur Hauptnavigation (Accesskey 2)
  • Bundesministerium Bildung, Wissenschaft und Forschung
  • Forschungsinfrastruktur-Datenbank
  • Start
  • Search
  • Mapping
    • Statistics by region
    • Cluster
    • Monitoring
    • Gallery
  • About
    • Research Institutions
    • Federal Ministry of Education, Science and Research (BMBWF)
    • Austrian Federal Economic Chamber (WKÖ)
    • Federal Ministry of Labor and Economic Affairs (BMAW)
  • FAQs & Info
    • FAQs
      • Description of the Research Infrastructure
      • Methods & Services for Research Infrastructure
      • Research infrastructure categories
      • Additional Information to research Infrastructure
      • Search Engine
      • Contact
    • Information
      • National Strategy of Research Infrastructure
      • Research infrastructures in the European Union
      • Research infrastructure databases / Research infrastructure networks
  • Registrieren
  • Login
  • DE
  • EN
Core facility (CF)

Zentrum am Berg

  • To Overview
  • »
  • 748 / 2245
  • »

University of Mining Leoben

Eisenerz | Website


Short Description

The research@ZaB enables research at highest level not just on all challanges related to tunnel and underground constructions such as further development of existing and the generation of new underground tunneling methods, but also special research questions of all kinds of industry. It enables the use and testing of new materials and equipment as well as the use of alternative tunnel ventilation systems. There are also completely new perspectives for the entire safety technology, including the extinguishing systems integrated in the tunnel. Within the scope of a large-scale EU-project, also possibilities for underground energy storage are explored at Zentrum am Berg. As a consequence, Montanuniversity also provides a sustainable political impulse for Upper Styria and especially for the region of Eisenerz.

Contact Person

Univ.-Prof. DI Dr. Robert Galler

Research Services

actually the research infrastructure is under construction

Methods & Expertise for Research Infrastructure

research and development infrastructure for underground and above ground tests with a scale of 1:1

Equipment

  • Eisenbahntunnel OST
  • Eisenbahntunnel WEST
  • Straßentunnel Süd
  • Straßentunnel NORD
  • Versuchstunnel

Terms of Use

If you wish to use the ZAB for your research activities, please contact: robert.galler@unileoben.ac.at

Contact

Univ.-Prof. DI Dr. Robert Galler
Department Zentrum am Berg
+43 3842 402 3400
robert.galler@unileoben.ac.at
https://www.subsurface.at

Location

Location on map

Share this entry

  • Facebook
  • Twitter
  • Pinterest
  • E-Mail
© 2023 FEDERAL MINISTRY of EDUCATION, SCIENCE and RESEARCH
  • Terms of use / General Data Protection Regulation
  • Declaration on accessibility
  • Imprint
  • Data protection settings